Santa Ana River Design Memorandum Number 1. Phase 2. GDM on the Santa Ana River Mainstem Including Santiago Creek. Main Report and Supplemental Environmental Impact Statement

Santa Ana River Design Memorandum Number 1. Phase 2. GDM on the Santa Ana River Mainstem Including Santiago Creek. Main Report and Supplemental Environmental Impact Statement
Author :
Publisher :
Total Pages : 752
Release :
ISBN-10 : OCLC:227731540
ISBN-13 :
Rating : 4/5 (40 Downloads)

Book Synopsis Santa Ana River Design Memorandum Number 1. Phase 2. GDM on the Santa Ana River Mainstem Including Santiago Creek. Main Report and Supplemental Environmental Impact Statement by : ARMY ENGINEER DISTRICT LOS ANGELES CA.

Download or read book Santa Ana River Design Memorandum Number 1. Phase 2. GDM on the Santa Ana River Mainstem Including Santiago Creek. Main Report and Supplemental Environmental Impact Statement written by ARMY ENGINEER DISTRICT LOS ANGELES CA. and published by . This book was released on 1988 with total page 752 pages. Available in PDF, EPUB and Kindle. Book excerpt: The Santa Ana River Mainstem Project, including Santiago Creek, is designed to provide urban flood protection to the growing communities in Orange, Riverside, and San Bernardino counties. The project will provide various levels of flood protection ranging from 100-year to 190-year in areas most susceptible to damages from floodflows for over 2 million people and businesses within the three-county area. Most of the development is in the Lower Santa Ana River Basin (Orange County). The project will provide environmental enhancement in a currently degraded marsh area at the mouth of the Santa Ana River, thereby providing significant value as a wetland habitat for migrating waterfowl and fot the California least tern, a federally listed endangered species. The project is intended to provide increased recreation opportunities through project related recreational developments on the Lower Santa Ana River and on Santiago Creek. Water conservation is not an authorized project purpose, but incidental water conservation benefits would be realized as a part of the recommended plan. (FR).


Santa Ana River Design Memorandum Number 1. Phase 2. GDM on the Santa Ana River Mainstem Including Santiago Creek. Main Report and Supplemental Environmental Impact Statement Related Books