Ecological Studies Related to Construction of the Defense Waste Processing Facility on the Savannah River Site. Annual Report, FY 1993

Ecological Studies Related to Construction of the Defense Waste Processing Facility on the Savannah River Site. Annual Report, FY 1993
Author :
Publisher :
Total Pages : 147
Release :
ISBN-10 : OCLC:68370454
ISBN-13 :
Rating : 4/5 (54 Downloads)

Book Synopsis Ecological Studies Related to Construction of the Defense Waste Processing Facility on the Savannah River Site. Annual Report, FY 1993 by :

Download or read book Ecological Studies Related to Construction of the Defense Waste Processing Facility on the Savannah River Site. Annual Report, FY 1993 written by and published by . This book was released on 1994 with total page 147 pages. Available in PDF, EPUB and Kindle. Book excerpt: Construction of the Defense Waste Processing Facility (DWPF) on the Savannah River Site (SRS) began during FY-1984. The Savannah River Ecology Laboratory (SREL) has completed 15 years of ecological studies related to the construction of the DWPF complex. Prior to construction, the 600-acre site (S-Area) contained a Carolina bay and the headwaters of a stream. Through the long-term census taking of biota at the DWPF site and Rainbow Bay, SREL has been evaluating the impact of construction on the biota and the effectiveness of mitigation efforts. similarly, the effects of erosion from the DWPF site on the water quality of S-Area peripheral streams are being assessed. This research provides supporting data relevant to the National Environmental Policy Act (NEPA) of 1969, the Endangered Species Act of 1973, Executive orders 11988 (Floodplain Management) and 11990 (Protection of Wetlands), and United States Department of Energy (DOE) Guidelines for Compliance with Floodplain/Wetland Environmental Review Requirements (10 CFR 1022).


Ecological Studies Related to Construction of the Defense Waste Processing Facility on the Savannah River Site. Annual Report, FY 1993 Related Books