The project activities will be conducted along the Right-of-Way (ROW) of the Paul-Allston No 1 and 2 - 500 kV transmission line corridor between towers 45/4 and
BPA proposes to remove unwanted vegetation along the right-of-way, access roads, and around tower structures of the subject transmission line corridor that may
BPA proposes to remove danger trees as well as unwanted vegetation in the rights-of-ways, along access roads and around tower structures that may impede the ope
BPA proposes to remove unwanted vegetation along the right-of-way, along access roads and around tower structures along the subject transmission line corridor t
Bonneville Power Administration (BPA) proposes to remove unwanted vegetation along the right-of- way, access roads, switch platforms, microwave beam paths, and